According to the contract signed with BOT Bach Dang Bridge Joint Stock Company, from 08/4/2016 ADCOM has performed the installation of equipment and testing of Osterberg Cell Load Test for 02 piles of Bach Dang Bridge, path and ending intersections Project.
 
Bach Dang Bridge, path and ending intersections Project with a total length of 5.4 km, 25 meters wide, is designed with 4 lanes, a maximum speed of 100 km / h. The bridge will link the Ha LongCity to the Ha Noi-Hai Phong Expressway. The bridge will be over three kilometres long, with a structure of reinforced concrete and reinforced concrete prestressed, navigable clearance of 250 meters wide, 48.4 meters high, withstand earthquakes will level 8. 

 

 

Testing work is done continuously for 2 piles D2000 at T28 Pier and T29 Pier of Bach Dang Bridge, reduced the duration of the contract as well as to ensure the progress of the whole project. With pile of T28 pier, the maximum test load up to 33.575kN. Same is the test load of 32.350kN for pile of T29 pier  - equivalent to 150% of the design load of the piles.
 
ADCOM has completed the Ocell Load Test at Bach Dang Bridge project is not only the performance of obligations to partners but also confirmed the position & master technology of Bi - Directional Test method, which is still new technical in Vietnam.
 
Some pictures of the installation and testing in the Project:
Installation equipments & instruments
 
Load cell
 
Supervision during install the steel cage

BOD congratulate success of the testing:

 

 

 

 

 

 

 

 

 