Red River Bridge
12/08/2016
Item work: Red River Bridge, KM78+084
Project: Noi Bai - Lao Cai Highway
Package: A3
ADCOM's work: Osterberg Cell Load Test for 01 bored pile at P3 pier (C14-P3), testing load is 29187.5 kN